I-70 / 32nd Ave Interchange System Level Feasibility Study

I-70 / 32nd Ave Interchange System Level Feasibility Study

Client:
City of Wheat Ridge

  • Results of the feasibility study (CDOT 1601 process) identified a series of alternatives that were merged into an Environmental Assessment
  • The effort involves contrasting numerous alternatives assessing various improvements, including roadway widening, new roadway connections, interchange reconfigurations, and new interchange access
  • Numerous public meetings held, and a public hearing will be conducted near the conclusion of the process.