Call Us

  • 303.721.1440 (Centennial)
  • 402.445.4405 (Omaha)

  • 719.314.1800 (Colorado Springs)
  • 402.438.7530 (Lincoln)

  • 712.435.3070 (Council Bluffs)

Access Management

  • US 34 1

    US 34 Access Control and Corridor Optimization Plan

    Project for CDOT Region 4. Colorado’s first Corridor Optimization Plan.

    Read more

  • Dell Range

    US 30 Dell Range Corridor Study

    Project for Cheyenne Metropolitan Planning Organization. Responding to rapid development, the study effort guided a detailed alternatives development and screening process of improvements identified in PlanCheyenne program to set the stage for eventual construction.

    Read more

  • US 85

    US 85 Access Control Plan

    Project for CDOT. Conducted a long-range Access Control Plan for 52-mile long stretch along US 85 to maintain and improve the functional integrity of the corridor (safety, capacity, and speed).

    Read more