Call Us

  • 303.721.1440 (Centennial)
  • 402.445.4405 (Omaha)

  • 719.314.1800 (Colorado Springs)
  • 402.438.7530 (Lincoln)

  • 712.435.3070 (Council Bluffs)

Structures

  • US 6 East Knox and Federal Bridges Under Construction

    US 6 Design-Build

    Lead Design consultant for improvements on US 6 at I-25 in Denver. 12 bridges, multiple new ramps, and park improvements within a tight, congested 1.25-mile corridor.

    Read more

  • 18th St Train

    18th Street Viaduct Preliminary Design

    Project development for a new viaduct over the Union Pacific Railroad and Canadian National Railroad mainlines and rail yard.

    Read more

  • Badger Gulch Girder Placement

    RidgeGate Parkway Bridges

    Structures over Badger Gulch and Happy Canyon Creek as part of a two-mile roadway extension in Douglas County.

    Read more

  • Evans Avenue over Santa Fe Aerial

    Evans Viaduct Rehabilitation

    Rehabilitation of a 38-year old structure in Denver, crossing Santa Fe Blvd (US 85), freight rail lines, and light rail lines as well as introducing bicycle/pedestrian amenities.

    Read more

  • BNSF freight train crossing Plum Creek

    BNSF over Plum Creek

    255 foot-long Class 1 railroad bridge serving BNSF Railway route through Castle Rock, Colorado.

    Read more

  • NRRC structure with BNSF and MAX BRT

    NRRC Pedestrian Bridge over BNSF

    Pedestrian bridge providing Fort Collins pedestrians and cyclists a grade separated crossing over the BNSF Railway.

    Read more