US 550 Mitigation Implementation

US 550 Mitigation Implementation

Client:
CDOT (Owner); FHU in a subconsultant role

Planning Area:
South-central Denver

  • Assisted with the mitigation implementation for the 12-mile project corridor
  • Worked closely with engineers and scientists to ensure that mitigation measures and environmental commitments within the EA and FONSI are incorporated into the design package
  • Mitigation tasks include the identification and implementation of 50+ wildlife crossing structures for small, medium, and large mammals to maintain/enhance habitat connectivity for wildlife