Client:
City of Lakewood
- ACEC Engineering Excellence Merit Award Recipient
- Replaced the deficient 80 foot steel truss bridge on Kipling Street
- Project required efforts in several disciplines, including environmental studies and mitigation, bridge hydraulics, utility coordination and design, bike trail design, roadway design, and a significant architectural coordination effort
- Public involvement effort included public art program with local schools, student mosaic designs incorporated into structure
- All design work and permits were completed within 8 months to meet the construction schedule