West Glenwood Roundabouts

West Glenwood Roundabouts

Client:
Glenwood Meadows Metro District

  • Design for two roundabouts at the existing interchange of I-70 and M.P. 114 in Glenwood Springs
  • Unique bulb-out design to minimize unnecessary lane changing within the roundabout
  • Pedestrian activity accommodated with strategically located crosswalks and sidewalk