Hess / Hilltop Widening and Improvements
hess hilltop a hess hilltop b

Hess / Hilltop Widening and Improvements

Client:
Douglas County

  • Provided preliminary and final design to widen 2.9 miles of roadway
  • Prepared contract documents on a fast track schedule to keep pace with adjacent development
  • Coordinated improvements at SH 83 with CDOT
  • Designed more than 6,000 linear feet of relocated water line
  • Created construction phasing and traffic control plans to minimize the impacts to the 12,000 vehicles that used Hilltop Road daily