
Hess / Hilltop Widening and Improvements
Client:
Douglas County
- Provided preliminary and final design to widen 2.9 miles of roadway
- Prepared contract documents on a fast track schedule to keep pace with adjacent development
- Coordinated improvements at SH 83 with CDOT
- Designed more than 6,000 linear feet of relocated water line
- Created construction phasing and traffic control plans to minimize the impacts to the 12,000 vehicles that used Hilltop Road daily
