
I-25 / 144th Avenue Interchange
Client:
City of Westminster and Thornton
- Designed as sister structure to the 136th Avenue / I-25 Interchange
- Conducted hydrologic and hydraulic analysis for roadway drainage and erosion control
- More than 9,500 feet of storm sewer designed to drain the new interchange, 144th Avenue, portions of Washington Street and offsite contributing flows
- Water quality facilities at the interchange and the ultimate outfall for the storm sewer prior to Big Dry Creek
- Prepared the CLOMR-F for the McKay Lake Drainage Way crossing at Bull Canal
